How a leading battery maker built a PCF model and connected its Digital Battery Passport data chain in 90 days (anonymized).
The challenge
With multiple plants and dozens of cell models, the company’s data was scattered across systems; EU customers demanded PCF and 2027 DPP readiness on a tight timeline.
The approach
The data platform unified multi-plant data, PCF was modelled per ISO 14067, traceability connected key-mineral origins, and the DPP data structure was pre-configured.
Results (anonymized)
PCF for the first models went live within 90 days and passed an EU buyer audit; the DPP data chain was ready, leaving ample buffer before the 2027 mandate.
BatteryDPP
Related

